bathroom remodel 2

Related images

Back up, with Tar Paper and roofing cement installed behind as waterproof membrane. :: bathroom remodel 2 ::

Back up, with Tar Paper and roofing cement installed behind as waterproof membrane. :: bathroom remodel 2 ::

OOPS! Forgot to put up the Waterproof membrane behind the cement board. :: bathroom remodel 2 ::

OOPS! Forgot to put up the Waterproof membrane behind the cement board. :: bathroom remodel 2 ::

cloroxed the vapor barrier. New receptor on floor. :: bathroom remodel 2 ::

cloroxed the vapor barrier. New receptor on floor. :: bathroom remodel 2 ::

Hepled John to install new shower regulator in both bathrooms. :: bathroom remodel 2 ::

Hepled John to install new shower regulator in both bathrooms. :: bathroom remodel 2 ::

See the 4' level in photo i bought for this project? Didn't use it much on the back wall, which was 47'' wide. :: bathroom remodel 2 ::

See the 4' level in photo i bought for this project? Didn't use it much on the back wall, which was 47'' wide. :: bathroom remodel 2 ::

Corner ceramic shelves. Drywall mud :: bathroom remodel 2 ::

Corner ceramic shelves. Drywall mud :: bathroom remodel 2 ::

Drywall repair (greenboard) :: bathroom remodel 2 ::

Drywall repair (greenboard) :: bathroom remodel 2 ::

mold on vapor barrier :: bathroom remodel 2 ::

mold on vapor barrier :: bathroom remodel 2 ::
bathroom remodel 2

bathroom remodel 2

0 comments

Related searches for bathroom remodel 2

Photo 30 of 44        27 | 28 | 29 | 30 | 31 | 32 | 33 |        prev | next        small | medium | large        Slideshow interval: off | 5 | 10 | 20 |